Skip to content

Municipal permit application capture

For Municipal application intake coordinators

Prepare applicant, site, proposed work and submitted details from a permit application with fields you can edit. Permit eligibility external.

25 free credits/month · No card needed

See the workflow and review checks

Inspect a document example.

Synthetic documents · Expected output
Standard documentPDF
municipal permit application captureFictional sample · For demonstration
applicant name
Example Applicant - synthetic
site address
100 Example Way, Sample City, CA 00000
application reference
DEMO-APPLICATION-0042
submission date
2026-09-30
proposed work text
Proposed work text explicitly printed in the original synthetic source for reviewer context.
stated project value
1250
attachment references
Attachment references explicitly printed in the original synthetic source for reviewer context.
{
  "applicant_name": "Example Applicant - synthetic",
  "site_address": "100 Example Way, Sample City, CA 00000",
  "application_reference": "DEMO-APPLICATION-0042",
  "submission_date": "2026-09-30",
  "proposed_work_text": "Proposed work text explicitly printed in the original synthetic source for reviewer context.",
  "stated_project_value": 1250,
  "attachment_references": "Attachment references explicitly printed in the original synthetic source for reviewer context."
}

A complete synthetic document with the visible values shown below. Real responses also include model-reported confidence, validation and result status. Test your own file with this schema.

When this work lands on your desk

A permit application arrives for municipal application intake coordinators. The next step needs applicant, site, proposed work and submitted details, recorded under the correct document reference before the information enters your program administration review queue.

An application describes proposed work but leaves a supporting attachment blank. Preserve the missing reference for human intake review. This schema keeps the source labels and values explicit so the reviewer can resolve the issue before downstream use.

Start with the documents you already collect

  • Permit application PDFs
  • Scanned or photographed permit application pages

PDF, JPEG, PNG, TIFF, or WEBP. Send one file per extraction call; create separate schemas when the document types need different fields.

  1. Define the fields

    Open the starter schema. Edit field descriptions, mark the values your process requires, and save it in your account.

  2. Extract at intake

    Send the document and saved schema slug to POST /api/v1/extract, or collect the file through a branded upload site.

  3. Hand off reviewed data

    After checking applicant name, site address, application reference, your application maps the reviewed record into your program administration review queue. Keep the original document reference with the result. Permit eligibility external. Dokyumi processes one file with a saved schema; your application owns record matching, business rules and updates to other systems.

A schema shaped around the next step.

Start with these fields, then adjust them to match your documents and destination system. The example above shows the data object you are asking Dokyumi to extract.

Download editable starter schema

Choose required fields for your process. The starter schema preserves any defined nested fields; refine line-item structures and test them on representative files.

FieldTypeWhat to capture
applicant_namestringApplicant name exactly as printed in this permit application. Preserve identifiers and qualifiers; do not look up or infer missing information.
site_addressstringSite address exactly as printed in this permit application. Preserve identifiers and qualifiers; do not look up or infer missing information.
application_referencestringApplication reference exactly as printed in this permit application. Preserve identifiers and qualifiers; do not look up or infer missing information.
submission_datedateSubmission date explicitly printed in this permit application. Keep it distinct from other dates; leave it empty if no calendar date is stated.
proposed_work_textstringProposed work text exactly as printed in this permit application. Preserve identifiers and qualifiers; do not look up or infer missing information.
stated_project_valuecurrencyStated project value explicitly labeled in this permit application. Preserve its sign and stated currency; do not calculate a missing amount.
attachment_referencesstringAttachment references exactly as printed in this permit application. Preserve identifiers and qualifiers; do not look up or infer missing information.

Give exceptions a clear path to review.

Dokyumi returns a model-reported confidence map, validation details, and a completed or review status for produced results. Check required fields and your business rules before passing data onward.

A completed extraction describes the extraction result. Your application and reviewers own matching, approvals, routing, and updates to other systems.

Read the response contract

Run a synthetic response through a review gate

Checks for this process

  • An application describes proposed work but leaves a supporting attachment blank. Preserve the missing reference for human intake review.
  • Check submission date against their own printed labels; leave an unstated date empty instead of deriving it.
  • Check stated project value for signs, decimal placement and stated currency before any downstream calculation or posting.

Prove the fit on a representative batch.

Test permit application examples from the layouts your team actually receives. Include the exception described here: An application describes proposed work but leaves a supporting attachment blank. Preserve the missing reference for human intake review. Compare the extracted applicant name, site address, application reference and any line rows with a reviewer's checked reference before enabling downstream actions.

Compare extracted values with a reviewer’s reference set. Record corrections, unresolved fields, review time, and credits used before connecting downstream actions.

The free plan’s credit limits apply. Assisted pilots are scoped with Dokyumi before work begins.

Expand when the next process is ready

Add recurring extraction capacity when permit application intake becomes routine. Reuse this field contract for layouts that express the same information; create a separate schema when the next document has different fields or review requirements.

For a tailored implementation

Discuss document volume, page lengths and schema setup for municipal application intake coordinators. Bring difficult permit application samples and the review requirements your implementation must preserve.

Talk through document mix and volume

Start small. Add capacity as intake grows.

All self-service plans include the REST API, upload-site webhooks, custom confidence thresholds, and schema inference. Choose by volume, schema count, and upload sites.

Free

$0/month

  • 25 credits/month
  • 2 schemas
  • 1 branded upload site
Test this workflow

Starter

$99/month

  • 500 credits/month
  • 10 schemas
  • 5 branded upload sites
Explore Starter

Growth

$499/month

  • 3,000 credits/month
  • 50 schemas
  • 25 branded upload sites
Explore Growth

Each document uses one credit per 5 pages, rounded up. An 8-page file uses 2 credits. Self-service files can be up to 50 pages; larger files, custom-built schemas, and additional volume are quoted through Enterprise. Full pricing details

Questions about municipal permit application capture

Which fields can I capture from a permit application?

The starter schema contains applicant name, site address, application reference, submission date, proposed work text, stated project value, attachment references. Edit those definitions and choose your required fields before saving. Array fields include defined sub-fields so row values have a validation structure.

What needs review in municipal permit application capture?

An application describes proposed work but leaves a supporting attachment blank. Preserve the missing reference for human intake review. Check the original source alongside model-reported confidence and validation output; completion status describes the extraction result, not the business decision.

How does this data reach your program administration review queue?

Save the schema, then send one supported PDF or image to POST /api/v1/extract with its slug. The response contains the data, model-reported confidence, validation and result status. Your application maps reviewed values to the destination; upload-site submissions can use a configured webhook. Permit eligibility external.

How do I test this workflow on my own documents?

Start free with 25 credits per month, 2 schemas, and 1 branded upload site. The starter schema opens in the schema builder after sign-up. Edit the fields, save it, and upload a representative file through your account or the extraction API. Account documents are stored according to Dokyumi’s privacy policy; contact hello@dokyumi.com for deletion requests and retention requirements.