Skip to content

Production work order intake

For Production planning document coordinators

Prepare product, revision, quantity, dates and routing as stated from a work order with fields you can edit. Production release external.

25 free credits/month · No card needed

See the workflow and review checks

Inspect a document example.

Synthetic documents · Expected output
Standard documentPDF
production work order intakeFictional sample · For demonstration
work order reference
DEMO-WORK_ORDER-0042
product reference
DEMO-PRODUCT-0042
revision label
Example revision label - synthetic
planned quantity
1
quantity unit
each
requested start date
2026-09-01
requested finish date
2026-09-30
routing text
Routing text explicitly printed in the original synthetic source for reviewer context.
{
  "work_order_reference": "DEMO-WORK_ORDER-0042",
  "product_reference": "DEMO-PRODUCT-0042",
  "revision_label": "Example revision label - synthetic",
  "planned_quantity": 1,
  "quantity_unit": "each",
  "requested_start_date": "2026-09-01",
  "requested_finish_date": "2026-09-30",
  "routing_text": "Routing text explicitly printed in the original synthetic source for reviewer context."
}

A complete synthetic document with the visible values shown below. Real responses also include model-reported confidence, validation and result status. Test your own file with this schema.

When this work lands on your desk

A work order arrives for production planning document coordinators. The next step needs product, revision, quantity, dates and routing as stated, recorded under the correct document reference before the information enters your quality or production document register.

A work order references an obsolete revision in an attachment note. Preserve the revision fields for planning review before release. This schema keeps the source labels and values explicit so the reviewer can resolve the issue before downstream use.

Start with the documents you already collect

  • Work order PDFs
  • Scanned or photographed work order pages

PDF, JPEG, PNG, TIFF, or WEBP. Send one file per extraction call; create separate schemas when the document types need different fields.

  1. Define the fields

    Open the starter schema. Edit field descriptions, mark the values your process requires, and save it in your account.

  2. Extract at intake

    Send the document and saved schema slug to POST /api/v1/extract, or collect the file through a branded upload site.

  3. Hand off reviewed data

    After checking work order reference, product reference, revision label, your application maps the reviewed record into your quality or production document register. Keep the original document reference with the result. Production release external. Dokyumi processes one file with a saved schema; your application owns record matching, business rules and updates to other systems.

A schema shaped around the next step.

Start with these fields, then adjust them to match your documents and destination system. The example above shows the data object you are asking Dokyumi to extract.

Download editable starter schema

Choose required fields for your process. The starter schema preserves any defined nested fields; refine line-item structures and test them on representative files.

FieldTypeWhat to capture
work_order_referencestringWork order reference exactly as printed in this work order. Preserve identifiers and qualifiers; do not look up or infer missing information.
product_referencestringProduct reference exactly as printed in this work order. Preserve identifiers and qualifiers; do not look up or infer missing information.
revision_labelstringRevision label exactly as printed in this work order. Preserve identifiers and qualifiers; do not look up or infer missing information.
planned_quantitynumberPlanned quantity as reported in this work order. Preserve the labeled measure and its unit; do not estimate it.
quantity_unitstringQuantity unit exactly as printed in this work order. Preserve identifiers and qualifiers; do not look up or infer missing information.
requested_start_datedateRequested start date explicitly printed in this work order. Keep it distinct from other dates; leave it empty if no calendar date is stated.
requested_finish_datedateRequested finish date explicitly printed in this work order. Keep it distinct from other dates; leave it empty if no calendar date is stated.
routing_textstringRouting text exactly as printed in this work order. Preserve identifiers and qualifiers; do not look up or infer missing information.

Give exceptions a clear path to review.

Dokyumi returns a model-reported confidence map, validation details, and a completed or review status for produced results. Check required fields and your business rules before passing data onward.

A completed extraction describes the extraction result. Your application and reviewers own matching, approvals, routing, and updates to other systems.

Read the response contract

Run a synthetic response through a review gate

Checks for this process

  • A work order references an obsolete revision in an attachment note. Preserve the revision fields for planning review before release.
  • Check requested start date, requested finish date against their own printed labels; leave an unstated date empty instead of deriving it.
  • Resolve missing work order reference, product reference, revision label against the source before using the record.

Prove the fit on a representative batch.

Test work order examples from the layouts your team actually receives. Include the exception described here: A work order references an obsolete revision in an attachment note. Preserve the revision fields for planning review before release. Compare the extracted work order reference, product reference, revision label and any line rows with a reviewer's checked reference before enabling downstream actions.

Compare extracted values with a reviewer’s reference set. Record corrections, unresolved fields, review time, and credits used before connecting downstream actions.

The free plan’s credit limits apply. Assisted pilots are scoped with Dokyumi before work begins.

Expand when the next process is ready

Add recurring extraction capacity when work order intake becomes routine. Reuse this field contract for layouts that express the same information; create a separate schema when the next document has different fields or review requirements.

For a tailored implementation

Discuss document volume, page lengths and schema setup for production planning document coordinators. Bring difficult work order samples and the review requirements your implementation must preserve.

Talk through document mix and volume

Start small. Add capacity as intake grows.

All self-service plans include the REST API, upload-site webhooks, custom confidence thresholds, and schema inference. Choose by volume, schema count, and upload sites.

Free

$0/month

  • 25 credits/month
  • 2 schemas
  • 1 branded upload site
Test this workflow

Starter

$99/month

  • 500 credits/month
  • 10 schemas
  • 5 branded upload sites
Explore Starter

Growth

$499/month

  • 3,000 credits/month
  • 50 schemas
  • 25 branded upload sites
Explore Growth

Each document uses one credit per 5 pages, rounded up. An 8-page file uses 2 credits. Self-service files can be up to 50 pages; larger files, custom-built schemas, and additional volume are quoted through Enterprise. Full pricing details

Questions about production work order intake

Which fields can I capture from a work order?

The starter schema contains work order reference, product reference, revision label, planned quantity, quantity unit, requested start date, requested finish date, routing text. Edit those definitions and choose your required fields before saving. Array fields include defined sub-fields so row values have a validation structure.

What needs review in production work order intake?

A work order references an obsolete revision in an attachment note. Preserve the revision fields for planning review before release. Check the original source alongside model-reported confidence and validation output; completion status describes the extraction result, not the business decision.

How does this data reach your quality or production document register?

Save the schema, then send one supported PDF or image to POST /api/v1/extract with its slug. The response contains the data, model-reported confidence, validation and result status. Your application maps reviewed values to the destination; upload-site submissions can use a configured webhook. Production release external.

How do I test this workflow on my own documents?

Start free with 25 credits per month, 2 schemas, and 1 branded upload site. The starter schema opens in the schema builder after sign-up. Edit the fields, save it, and upload a representative file through your account or the extraction API. Account documents are stored according to Dokyumi’s privacy policy; contact hello@dokyumi.com for deletion requests and retention requirements.