Schedule progress report intake
For Construction schedule reporting teams
Prepare activity IDs, reporting date and stated completion percentages from a progress report with fields you can edit. Forecasting external.
25 free credits/month · No card needed
See the workflow and review checksInspect a document example.
Synthetic documents · Expected output- project name
- Example Community Workshop - synthetic
- report date
- 2026-09-30
- schedule revision
- Example schedule revision - synthetic
- activity rows
- [ { "activity_reference": "DEMO-ACTIVITY-0042", "description": "Example document line - original synthetic data", "percent_complete": 50, "remaining_duration_text": "Remaining duration text explicitly printed in the original synthetic source for reviewer context.", "stated_finish_date": "2026-09-30" } ]
- stated overall progress
- 50
{
"project_name": "Example Community Workshop - synthetic",
"report_date": "2026-09-30",
"schedule_revision": "Example schedule revision - synthetic",
"activity_rows": [
{
"activity_reference": "DEMO-ACTIVITY-0042",
"description": "Example document line - original synthetic data",
"percent_complete": 50,
"remaining_duration_text": "Remaining duration text explicitly printed in the original synthetic source for reviewer context.",
"stated_finish_date": "2026-09-30"
}
],
"stated_overall_progress": 50
}A complete synthetic document with the visible values shown below. Real responses also include model-reported confidence, validation and result status. Test your own file with this schema.
When this work lands on your desk
A progress report arrives for construction schedule reporting teams. The next step needs activity IDs, reporting date and stated completion percentages, recorded under the correct document reference before the information enters your project document review register.
A schedule reports percent complete beside remaining duration. Preserve the printed measures without forecasting project completion. This schema keeps the source labels and values explicit so the reviewer can resolve the issue before downstream use.
Start with the documents you already collect
- Progress report PDFs
- Scanned or photographed progress report pages
PDF, JPEG, PNG, TIFF, or WEBP. Send one file per extraction call; create separate schemas when the document types need different fields.
Define the fields
Open the starter schema. Edit field descriptions, mark the values your process requires, and save it in your account.
Extract at intake
Send the document and saved schema slug to
POST /api/v1/extract, or collect the file through a branded upload site.Hand off reviewed data
After checking project name, report date, schedule revision, your application maps the reviewed record into your project document review register. Keep the original document reference with the result. Forecasting external. Dokyumi processes one file with a saved schema; your application owns record matching, business rules and updates to other systems.
A schema shaped around the next step.
Start with these fields, then adjust them to match your documents and destination system. The example above shows the data object you are asking Dokyumi to extract.
Download editable starter schemaChoose required fields for your process. The starter schema preserves any defined nested fields; refine line-item structures and test them on representative files.
| Field | Type | What to capture |
|---|---|---|
project_name | string | Project name exactly as printed in this progress report. Preserve identifiers and qualifiers; do not look up or infer missing information. |
report_date | date | Report date explicitly printed in this progress report. Keep it distinct from other dates; leave it empty if no calendar date is stated. |
schedule_revision | string | Schedule revision exactly as printed in this progress report. Preserve identifiers and qualifiers; do not look up or infer missing information. |
activity_rows | array | Every visible activity rows row in this progress report. Preserve separate rows, labels and qualifiers; do not merge entries or reconstruct missing ones. |
stated_overall_progress | number | Stated overall progress as reported in this progress report. Preserve the labeled measure and its unit; do not estimate it. |
Give exceptions a clear path to review.
Dokyumi returns a model-reported confidence map, validation details, and a completed or review status for produced results. Check required fields and your business rules before passing data onward.
A completed extraction describes the extraction result. Your application and reviewers own matching, approvals, routing, and updates to other systems.
Read the response contractChecks for this process
- A schedule reports percent complete beside remaining duration. Preserve the printed measures without forecasting project completion.
- Check report date against their own printed labels; leave an unstated date empty instead of deriving it.
- Compare every activity rows row with the source, including continuation pages, separate categories and repeated table headings.
Prove the fit on a representative batch.
Test progress report examples from the layouts your team actually receives. Include the exception described here: A schedule reports percent complete beside remaining duration. Preserve the printed measures without forecasting project completion. Compare the extracted project name, report date, schedule revision and any line rows with a reviewer's checked reference before enabling downstream actions.
Compare extracted values with a reviewer’s reference set. Record corrections, unresolved fields, review time, and credits used before connecting downstream actions.
The free plan’s credit limits apply. Assisted pilots are scoped with Dokyumi before work begins.
Expand when the next process is ready
Add recurring extraction capacity when progress report intake becomes routine. Reuse this field contract for layouts that express the same information; create a separate schema when the next document has different fields or review requirements.
For a tailored implementation
Discuss document volume, page lengths and schema setup for construction schedule reporting teams. Bring difficult progress report samples and the review requirements your implementation must preserve.
Talk through document mix and volumeStart small. Add capacity as intake grows.
All self-service plans include the REST API, upload-site webhooks, custom confidence thresholds, and schema inference. Choose by volume, schema count, and upload sites.
Each document uses one credit per 5 pages, rounded up. An 8-page file uses 2 credits. Self-service files can be up to 50 pages; larger files, custom-built schemas, and additional volume are quoted through Enterprise. Full pricing details
Questions about schedule progress report intake
Which fields can I capture from a progress report?
The starter schema contains project name, report date, schedule revision, activity rows, stated overall progress. Edit those definitions and choose your required fields before saving. Array fields include defined sub-fields so row values have a validation structure.
What needs review in schedule progress report intake?
A schedule reports percent complete beside remaining duration. Preserve the printed measures without forecasting project completion. Check the original source alongside model-reported confidence and validation output; completion status describes the extraction result, not the business decision.
How does this data reach your project document review register?
Save the schema, then send one supported PDF or image to POST /api/v1/extract with its slug. The response contains the data, model-reported confidence, validation and result status. Your application maps reviewed values to the destination; upload-site submissions can use a configured webhook. Forecasting external.
How do I test this workflow on my own documents?
Start free with 25 credits per month, 2 schemas, and 1 branded upload site. The starter schema opens in the schema builder after sign-up. Edit the fields, save it, and upload a representative file through your account or the extraction API. Account documents are stored according to Dokyumi’s privacy policy; contact hello@dokyumi.com for deletion requests and retention requirements.