Skip to content

Subcontractor bid capture

For Construction estimating coordinators

Prepare trade, scope, exclusions and quoted amount from a bid proposal with fields you can edit. Award decision external.

25 free credits/month · No card needed

See the workflow and review checks

Inspect a document example.

Synthetic documents · Expected output
Standard documentPDF
subcontractor bid captureFictional sample · For demonstration
bidder name
Example Bidder - synthetic
project name
Example Community Workshop - synthetic
trade name
Example Trade - synthetic
bid date
2026-09-30
base bid
1250
alternates
[ { "alternate_reference": "DEMO-ALTERNATE-0042", "description": "Example document line - original synthetic data", "amount": 1250, "direction": "credit" } ]
exclusions text
Exclusions text explicitly printed in the original synthetic source for reviewer context.
{
  "bidder_name": "Example Bidder - synthetic",
  "project_name": "Example Community Workshop - synthetic",
  "trade_name": "Example Trade - synthetic",
  "bid_date": "2026-09-30",
  "base_bid": 1250,
  "alternates": [
    {
      "alternate_reference": "DEMO-ALTERNATE-0042",
      "description": "Example document line - original synthetic data",
      "amount": 1250,
      "direction": "credit"
    }
  ],
  "exclusions_text": "Exclusions text explicitly printed in the original synthetic source for reviewer context."
}

A complete synthetic document with the visible values shown below. Real responses also include model-reported confidence, validation and result status. Test your own file with this schema.

When this work lands on your desk

A bid proposal arrives for construction estimating coordinators. The next step needs trade, scope, exclusions and quoted amount, recorded under the correct document reference before the information enters your project document review register.

A bid has a base price and a deductive alternate. Preserve both and retain exclusions before a procurement comparison. This schema keeps the source labels and values explicit so the reviewer can resolve the issue before downstream use.

Start with the documents you already collect

  • Bid proposal PDFs
  • Scanned or photographed bid proposal pages

PDF, JPEG, PNG, TIFF, or WEBP. Send one file per extraction call; create separate schemas when the document types need different fields.

  1. Define the fields

    Open the starter schema. Edit field descriptions, mark the values your process requires, and save it in your account.

  2. Extract at intake

    Send the document and saved schema slug to POST /api/v1/extract, or collect the file through a branded upload site.

  3. Hand off reviewed data

    After checking bidder name, project name, trade name, your application maps the reviewed record into your project document review register. Keep the original document reference with the result. Award decision external. Dokyumi processes one file with a saved schema; your application owns record matching, business rules and updates to other systems.

A schema shaped around the next step.

Start with these fields, then adjust them to match your documents and destination system. The example above shows the data object you are asking Dokyumi to extract.

Download editable starter schema

Choose required fields for your process. The starter schema preserves any defined nested fields; refine line-item structures and test them on representative files.

FieldTypeWhat to capture
bidder_namestringBidder name exactly as printed in this bid proposal. Preserve identifiers and qualifiers; do not look up or infer missing information.
project_namestringProject name exactly as printed in this bid proposal. Preserve identifiers and qualifiers; do not look up or infer missing information.
trade_namestringTrade name exactly as printed in this bid proposal. Preserve identifiers and qualifiers; do not look up or infer missing information.
bid_datedateBid date explicitly printed in this bid proposal. Keep it distinct from other dates; leave it empty if no calendar date is stated.
base_bidcurrencyBase bid explicitly labeled in this bid proposal. Preserve its sign and stated currency; do not calculate a missing amount.
alternatesarrayEvery visible alternates row in this bid proposal. Preserve separate rows, labels and qualifiers; do not merge entries or reconstruct missing ones.
exclusions_textstringExclusions text exactly as printed in this bid proposal. Preserve identifiers and qualifiers; do not look up or infer missing information.

Give exceptions a clear path to review.

Dokyumi returns a model-reported confidence map, validation details, and a completed or review status for produced results. Check required fields and your business rules before passing data onward.

A completed extraction describes the extraction result. Your application and reviewers own matching, approvals, routing, and updates to other systems.

Read the response contract

Run a synthetic response through a review gate

Checks for this process

  • A bid has a base price and a deductive alternate. Preserve both and retain exclusions before a procurement comparison.
  • Check bid date against their own printed labels; leave an unstated date empty instead of deriving it.
  • Check base bid for signs, decimal placement and stated currency before any downstream calculation or posting.
  • Compare every alternates row with the source, including continuation pages, separate categories and repeated table headings.

Prove the fit on a representative batch.

Test bid proposal examples from the layouts your team actually receives. Include the exception described here: A bid has a base price and a deductive alternate. Preserve both and retain exclusions before a procurement comparison. Compare the extracted bidder name, project name, trade name and any line rows with a reviewer's checked reference before enabling downstream actions.

Compare extracted values with a reviewer’s reference set. Record corrections, unresolved fields, review time, and credits used before connecting downstream actions.

The free plan’s credit limits apply. Assisted pilots are scoped with Dokyumi before work begins.

Expand when the next process is ready

Add recurring extraction capacity when bid proposal intake becomes routine. Reuse this field contract for layouts that express the same information; create a separate schema when the next document has different fields or review requirements.

For a tailored implementation

Discuss document volume, page lengths and schema setup for construction estimating coordinators. Bring difficult bid proposal samples and the review requirements your implementation must preserve.

Talk through document mix and volume

Start small. Add capacity as intake grows.

All self-service plans include the REST API, upload-site webhooks, custom confidence thresholds, and schema inference. Choose by volume, schema count, and upload sites.

Free

$0/month

  • 25 credits/month
  • 2 schemas
  • 1 branded upload site
Test this workflow

Starter

$99/month

  • 500 credits/month
  • 10 schemas
  • 5 branded upload sites
Explore Starter

Growth

$499/month

  • 3,000 credits/month
  • 50 schemas
  • 25 branded upload sites
Explore Growth

Each document uses one credit per 5 pages, rounded up. An 8-page file uses 2 credits. Self-service files can be up to 50 pages; larger files, custom-built schemas, and additional volume are quoted through Enterprise. Full pricing details

Questions about subcontractor bid capture

Which fields can I capture from a bid proposal?

The starter schema contains bidder name, project name, trade name, bid date, base bid, alternates, exclusions text. Edit those definitions and choose your required fields before saving. Array fields include defined sub-fields so row values have a validation structure.

What needs review in subcontractor bid capture?

A bid has a base price and a deductive alternate. Preserve both and retain exclusions before a procurement comparison. Check the original source alongside model-reported confidence and validation output; completion status describes the extraction result, not the business decision.

How does this data reach your project document review register?

Save the schema, then send one supported PDF or image to POST /api/v1/extract with its slug. The response contains the data, model-reported confidence, validation and result status. Your application maps reviewed values to the destination; upload-site submissions can use a configured webhook. Award decision external.

How do I test this workflow on my own documents?

Start free with 25 credits per month, 2 schemas, and 1 branded upload site. The starter schema opens in the schema builder after sign-up. Edit the fields, save it, and upload a representative file through your account or the extraction API. Account documents are stored according to Dokyumi’s privacy policy; contact hello@dokyumi.com for deletion requests and retention requirements.